When I first load a large log file with > 50,000 frames the top graph shows all frames but the graphs beneath this stop at 50,000. A replot truncates all graphs to 50,000 frames. An export of the log shows the frames that the dashboard is truncating.

How can I get the dashboard to show frame numbers > 50,000?