Page 1 of 2 12 LastLast
Results 1 to 10 of 13

Thread: Its been quiet, but we've been hard at work...

  1. #1
    EFILive Developer Site Admin Blacky's Avatar
    Join Date
    Mar 2003
    Posts
    9,505

    Default Its been quiet, but we've been hard at work...

    Just an update.

    I know things have been quiet here for a while. I've been away on holidays, got back and made the hard decision to stop development work and redesign part of the BB logging that was not performing as well as it could. It has taken a few weeks but I think it has been worth it.

    Unfortunately, the end users (you guys/gals) won't notice any difference. The changes have been in the configuration files at our end. BUT it will make it *much* easier and faster for us to add new PIDs and bidirectional controls for supported controllers in future.

    We are currently working on entering* the enhanced and DMA PIDs for all supported controllers. Once that is done a new firmware update will be available with full PID black box logging.

    * i.e. transfering the PID definition data from the V2 gm_enhanced.prn file to the new BB logging *.pmm files.

    Note: User defined calculated PIDs will not be supported in BB logging. They can still be added later in the PC scan tool. Some commonly used pre-defined calc pids will be made available for BB logging - but they won't be user editable.

    Regards
    Paul
    Before asking for help, please read this.

  2. #2
    Lifetime Member Scoota's Avatar
    Join Date
    Mar 2005
    Posts
    241

    Default

    Paul, We all need a break once in a while including you.The efforts of yourself and Ross are quite often taken for granted.Keep up the great work. We appreciate it.Cheers Scotty.
    It's a lot easier to ask for forgiveness than it is to ask for permission.



  3. #3
    Lifetime Member eboggs_jkvl's Avatar
    Join Date
    Apr 2004
    Posts
    757

    Default

    Hey! They get 2 potty breaks a day and one 10 minute feeding period. Allowing for 2 hours sleep per week should be enough for normal programmers.


    So what's with the holiday stuff? Isn't that a little overkill on the R&R side of the ledger!



    Elmer

  4. #4
    EFILive Developer Site Admin Blacky's Avatar
    Join Date
    Mar 2003
    Posts
    9,505

    Default

    Quote Originally Posted by eboggs_jkvl
    Hey! They get 2 potty breaks a day and one 10 minute feeding period. Allowing for 2 hours sleep per week should be enough for normal programmers.
    Luxury!

    Quote Originally Posted by eboggs_jkvl
    So what's with the holiday stuff? Isn't that a little overkill on the R&R side of the ledger!



    Elmer
    Yes

    Paul
    Before asking for help, please read this.

  5. #5
    New Member
    Join Date
    Feb 2007
    Posts
    9

    Default

    I'm not a Beta user so I'm interested in a guess on the date for public release.

  6. #6
    Lifetime Member mr.prick's Avatar
    Join Date
    Nov 2006
    Posts
    3,195

    Default

    what about serial connection for WBO2
    and RTACS data application?

  7. #7
    EFILive Developer Site Admin Blacky's Avatar
    Join Date
    Mar 2003
    Posts
    9,505

    Default

    Quote Originally Posted by mr.prick
    what about serial connection for WBO2
    and RTACS data application?
    The BB logging will go live before that is available for testing.
    Regarsd
    Paul
    Before asking for help, please read this.

  8. #8
    EFILive Developer Site Admin Blacky's Avatar
    Join Date
    Mar 2003
    Posts
    9,505

    Default

    Quote Originally Posted by stkshkr
    I'm not a Beta user so I'm interested in a guess on the date for public release.
    We will be releasing the full PID lists for all controllers, including DMA PIDs. After they are available and the testers have had a chance to log data using them, it will be released.

    The plan is to have those PIDs available before March, the release will be soon after that. But that's just a guess.

    Regards
    Paul
    Before asking for help, please read this.

  9. #9
    Lifetime Member
    Join Date
    May 2007
    Posts
    254

    Default

    nice to see this progressing. Having had a laptop failure recently (broke a usb port) and now my charger is playing up - i cannot wait for the BB to be fully released

    I know someone has asked and without setting unrealistic expections is the ETA for the serial interface this year?

  10. #10
    EFILive Developer Site Admin Blacky's Avatar
    Join Date
    Mar 2003
    Posts
    9,505

    Default

    Quote Originally Posted by stigmundfreud
    I know someone has asked and without setting unrealistic expections is the ETA for the serial interface this year?
    Yes.
    Regards
    Paul
    Before asking for help, please read this.

Page 1 of 2 12 LastLast

Similar Threads

  1. scanner buttons work work?
    By pullincrazy88 in forum FlashScan V2
    Replies: 7
    Last Post: May 16th, 2009, 01:12 PM
  2. All is quiet on the Beta Front...?
    By Goldfinger911 in forum FlashScan V2 BB Logging
    Replies: 20
    Last Post: February 8th, 2008, 03:22 AM
  3. would this be hard
    By zrx1200 in forum Custom Operating Systems
    Replies: 9
    Last Post: August 7th, 2006, 08:29 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •