Just looking to see how much interest there is for point-to-point cables.
Edit: Moved the purchasing stuff to a new thread
Photo of sLM2 cable
Innovative LM-2 to Flashscan V2
Innovative LM-1 to Flashscan V2
Innovative LC-1 to Flashscan V2
AEM
TechEdge
Other (Please post your "other")
Just looking to see how much interest there is for point-to-point cables.
Edit: Moved the purchasing stuff to a new thread
Photo of sLM2 cable
Last edited by TAQuickness; August 15th, 2008 at 09:31 PM.
DigitalEFI- EFILive US Distributor
sales@digitalefi.com
678/344-1590
I made a 8mm stereo to rj45. I'm guessing this would be VERY useful.
07 Silverado DMax Classic
02 Z06 LS3 416, 805rwhp, TFS245, Wiseco, Callies Crank/Rods, Iskendarian Lifters, Crower Rockers, FAST102/90, ATI Damper, 1-7/8 Kook's LT, QkTime Shield,Tolle-Fab 8pt
Old Engine: 1/4mile = 9.6/146 New Engine:?
EFI Live Tune/Scan v7.5.27, EFI Live Scan and Tune v8.2.23, build 276, BootBlock 2.07.06, FirmWare 2.07.52, 512K RoadRunner (12.14.R), Innovate Serial LC2x2
COS5/12212156 For 2002 Z06 Manual Vette
You know I crave LM-2 serial.
Last edited by Bruce Melton; August 10th, 2008 at 01:29 AM.
2000 C5 Coupe, 6M, Callies/Mahle stroked LS7 (441), Blackwing, Halltech, LS3 intake, 90mm Shaner TB, ported L92 heads, FAST 50# inj, not too much cam, Kooks 1 7/8" headers , 3" catless mid pipes, Z TIs, track suspension, , 3:90 rear, EFI V2, LM-2, etc.
PowrMax Performance
100 mm PowrMAF
LM-2 EFILIve package with TAQ -sLM2 V-2 serial cable> Package deals
Unfortunately PLX is lots more than just a cable:
http://forum.efilive.com/showthread....ght=plx+serial
2000 C5 Coupe, 6M, Callies/Mahle stroked LS7 (441), Blackwing, Halltech, LS3 intake, 90mm Shaner TB, ported L92 heads, FAST 50# inj, not too much cam, Kooks 1 7/8" headers , 3" catless mid pipes, Z TIs, track suspension, , 3:90 rear, EFI V2, LM-2, etc.
PowrMax Performance
100 mm PowrMAF
LM-2 EFILIve package with TAQ -sLM2 V-2 serial cable> Package deals
Yeah I know, I have one of those MAX3232 boards on order.
+1 for the LC-1.
i would like to get rid of 10' of cables and null modem. LOL
I hear ya...
I have a few LM2 cables on hand and should have LC1 cables ready early next week.